We use cookies to improve your experience and understand how the site is used. Privacy Policy

RCRA Hazardous Waste Number

P114

Thallium(I) selenite

Official source: 40 CFR Part 261 (eCFR)

Have a P114 stream? See the dossier that replaces the feasibility study.

See the validation dossier
High recoveryReturn to supplier or redistribution
High recoveryReclamation of the chemical product
Simulate this stream

Hazard Basis

Listed - acutely hazardous

CAS Number

12039-52-0

Regulation

40 CFR Part 261

Need recovery options for a P114 stream?

Map recovery routes for P114

Classification

See the full P list

Unused commercial chemical products that are acutely hazardous when discarded — even in small quantities. One kilogram per month can make a site a large-quantity generator.

How P114 is handled

01

P codes cover UNUSED commercial chemical products being discarded - not process waste containing the chemical.

02

Acutely hazardous: generating more than 1 kg/month makes a site a large-quantity generator.

03

Container residues and spill cleanup material carry the same P code.

Where can a P114 stream go?

Recognized recovery routes for this waste family, ranked by typical recovery tier. Which route fits depends on your specific stream — composition, volume and region.

Return to supplier or redistribution

High recovery

Unused, on-spec chemical product that finds a user has never been discarded — redistribution, resale or return to the supplier keeps it out of the waste system entirely.

40 CFR 261.2(c)(3) Table 1 — commercial chemical products being reclaimed

Reclamation of the chemical product

High recovery

Commercial chemical products being reclaimed are not solid wastes: off-spec, expired or surplus inventory processed back to usable product exits hazardous waste regulation.

40 CFR 261.2(c)(3) Table 1 — commercial chemical products being reclaimed

These are the typical routes for the P list. Your stream's actual options depend on its composition and where it sits.

See how this gets validated

Simulate your P114 stream

Thallium(I) selenite

With a lab analysis, the engine checks the stream against each receiving route's published limits and returns what is supported, what is refused, and why. Without one yet, we tell you which routes it can evaluate and what analysis that needs.

What do you need?

An engineer replies within 1 business day. That reply confirms what is needed to run the dossier and when it can follow. A route the engine does not cover yet is reported as not yet evaluable, with the evidence that would change that.

See what the output looks like: a worked dossier.